Return to Index
Operations Research Models and Methods
 
Problems Section
Problems for Network Flow Programming Models
 - Aggregate Production Scheduling with Overtime

Part a. Inventory cost is a linear function of the time an item is stored.

Arc Data and Flows

Num.

Name

Flow

1

I0

15

2

R1

100

3

O1

5

4

I1

60

5

R2

100

6

O2

0

7

B2

0

8

I2

80

9

R3

60

10

O3

0

11

B3

0

12

I3

0

Part b. Inventory cost depends on time the item is stored in a nonlinear fashion.


  
Return to Top

tree roots

Operations Research Models and Methods
Internet
by Paul A. Jensen
Copyright 2001 - All rights reserved