1.
|
|
Distribution
and Worker Assignment |
***
|
2.
|
|
Contractor Job
Assignments |
*
|
3.
|
|
Class Scheduling |
***
|
4.
|
|
Ambulance Routing
|
**
|
5.
|
|
Crew Assignment |
*
|
6.
|
|
Transportation
Problem |
*
|
7.
|
|
Linear Programming
Equivalent |
*
|
8.
|
|
Aggregate Production
Schedule with Overtime |
***
|
9.
|
|
Military Aircraft
Routing |
*****
|
10.
|
|
Variations on
the Shortest Path Problem |
***
|
11.
|
|
Distance Problems |
**
|
12.
|
|
Production Scheduling
with Two Machines |
***
|
13.
|
|
Service Facilities
in a Geographic Area |
**
|
14.
|
|
Transformation
of Labor and Raw Materials |
***
|