Return to Index
Operations Research Models and Methods
 
Problems Section
Problems for Network Flow Programming Models
 - Contractor Job Assignment

The figure below shows the network model. Arc costs are negative because the network model minimizes cost and this is a profit maximization problem.


  
Return to Top

tree roots

Operations Research Models and Methods
Internet
by Paul A. Jensen
Copyright 2001 - All rights reserved